From a bird’s view

 

Watch the video:

The Speedy Gonzales challenge

With one of the collaborating companies in Spain, we are able to challenge the fastest in speed. In this facility that is coming to an end, an 880m2 apartment building has been built on the Mediterranean Coast, near Valencia.

It consists of 16 apartments, distributed on two floors of 8 apartments each. It has been, without a doubt, a clear demonstration of the speed of assembly of our system based on cold formed steel structures, steel framing.

Some of the data of this performance are:

– The first days of February 2015, the earthworks began.
– February 12, 2015 begins the foundation slab with preparation of facilities.
– On February 20, 2015 the first profiles leave the factory in Nisko.
– On February 23, 2015 the on-site assembly of the structure began.
– At the beginning of March 2015 there are 400m2 in a very advanced state of execution.
– On March 30, 2015, the entire building is assembled and the 8 apartments on the ground floor are ready, ready to be used.
– In April 2015 the apartments on the first floor were completed and the building was fully finished and equipped. TWO MONTHS HAVE PASSED SINCE THE START OF THE WORK !!!

EASY, FAST, FUN, WITH IMPECCABLE RESULTS !!!

We invite you to see the photographs:

Football Changing Rooms – Chlebnia

Support facilities for soccer fields in Chlebnia, Grodzisk region, Mazowiecki.

On June 1, 2014 these facilities were inaugurated. The building made
in cold-formed steel structure, SCS, steel framing, it also has Heatlok Soy foam chamber thermal insulation and external coverings in Cetris Finish boards. The heat transfer ratio achieved was = 0.20W / m2k with an external wall thickness of only 13 cm.

Our company also participated in the assembly and installation works.
Watch the video:

Play Video

BUDMA Fair 2013

From January 29 to February 1, 2013, we participated in the Budma 2013 International Construction Fair, which took place in Poznan. We exhibited with our business partner, CETRIS, a cement particle board manufacturer. We would like to thank all the visitors and interested parties who passed by our stand and with whom we had very interesting meetings.

We will be delighted to attend to the many requests to solve with our experience and technology all the needs of our clients, arising during the fair.

Prize for the most interesting product of the Stalowa Wola fair

From May 21 to 22, 2011, Stalart participated in the 1st regional repair and construction fair, which took place in Salowa Wola. Participation in the fair was very fruitful.

 

Our offer received an award for the most interesting product promoted during the fair.