Skip to content

Collaboration between teams and construction systems

Description: New example of collaboration between teams and construction systems, with the ultimate goal of achieving the best result for the client.

In this project, the coexistence of a more traditional system and STALART’s steel frame system, contributing the industrialized construction part, makes possible a final product adapted to the impositions of the terrain’s orography.

In collaboration with RAAN arquitectura, the design of the structure of this dwelling accurately reproduces the architectural plan to the millimeter.

Location: Algar (Valencia)

Project phase: Design, structural calculation justification, and manufacturing.

Call Now Button